Project Management
Design Management & Specifications
Tendering Procedures
Construction Management
Quality Management & Auditing
Health & Safety
Information & Communication Technology
Environmental Policy
Management of Cultural Heritage
Innovations
O & M Guidelines
Useful links

  Click to increase fonts size click to decrease font size   RESET  
        

 

 
THE EGNATIA ODOS PROJECT IS FUNDED BY:
smore
EUROPEAN UNION
EUROPEAN INVESTMENT BANK
COMMUNITY SUPPORT FRAMEWORK (2000 - 2006)
NATIONAL STRATEGIC REFERENCE FRAMEWORK (NSRF) 2007-2013
MINISTRY OF INFRASTRUCTURE, TRANSPORT AND NETWORKS
You are here: Homepage | ORGANIZATION & MANAGEMENT METHODS |  
Project Management  

Implementation of a Quality Management System in accordance with the Standard ELOT ΕΝ ISO 9001:2008 that ensures the quality of the constructed project and the Company activities. Within this framework, Operating Procedures for the management and supervision of the Company works and activities were established.
Development of a strategy for the management of works-design contracts, which is revised on the basis of the current conditions and aims at the prompt completion of works and opening of road sections to traffic (innovations in the Regulation for design and works, advance works).
Establishment of Guidelines for Conducting Road Works Designs (OSMEO) that now constitute part of the contractual documents for the preparation of designs and the construction of works. These Guidelines stipulate the design principles and specifications to be applied in each highways design stage. This document updates and, more importantly, supplements the National Design Specifications.
Official participation of experts from abroad to deliver their opinion on how to solve special design and construction technical problems of extreme difficulty.
Award of call-up contracts (framework contracts) to designers selected through international competitions, so that any problems encountered can be dealt with immediately.
Participation of Independent Checkers for major bridge and tunnel designs.
Preparation of standard tender documents. These include descriptive price lists for approx. 900 work items, which by Law 3263 regarding public works were stipulated as being mandatory nationwide. In addition, a database was created to include the costs of all types of materials and works.
Provision for the professional indemnity and third-party insurance of designs and construction works.
Development of a Digital Register and a Document Control System that supports reporting and tracking of all types of submitted designs.


   
(Click on the pictures for a larger version)

More pictures

Back to list



 Print  Send


go


FOR INFORMATION ABOUT THE TRAFFIC CONDITIONS ON THE EGNATIA MOTORWAY (if travelling along the road), CALL AT THE EMERGENCY PHONE 
1077

Distances
Submit Maintenance Service Request
Travel Time

Information

for the press



The Weather

in Egnatia Motorway



Polls


© 2007-2012 EGNATIA ODOS Α.E. | Site Map | Terms of use | Disclaimer powered by OSMIUMTM | Creative Marketing S.A.